BS PD IEC TR 63368:2024

BS PD IEC TR 63368:2024

BS PD IEC TR 63368:2024 Control and protection systems for high-voltage direct current (HVDC) power transmission systems. Off-site real-time simulation testing

standard byBSI Group , 10/03/2024

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$48.96

$272.00

(price reduced by 82 %)

This document provides guidance on off-site real-time simulation tests of control and protection(CP) systems for HVDC power transmission systems. The off-site real-time simulation testsare carried out after the testing of CP devices and prior to on-site system tests.

This document covers point-to-point, back-to-back, and multi-terminal HVDC systems of linecommutated converters (LCC), voltage-sourced converters (VSC) and hybrid HVDCtechnologies.

In order to provide practical guidance for the functional performance tests of HVDC powertransmission systems, this document covers the test environment, the contents and methods offunctional performance tests, and the test report.

Product Details

Published:

10/03/2024

ISBN(s):

9780539315714

Number of Pages:

34

File Size:

1 file , 1.5 MB

Product Code(s):

30491734, 30491734, 30491734

Note:

This product is restricted and cannot be purchased in the following countries Ukraine, Russia, Belarus

Contact us